Ram Jhula Pedestrian Bridge to Be Built on Godavari River in Nashik Ahead of Simhastha Kumbh Mela

Ram Jhula Pedestrian Bridge to Be Built on Godavari River in Nashik Ahead of Simhastha Kumbh Mela

Analysis:

  1. Purpose of the Bridge:
    • The Ram Jhula bridge is being constructed to facilitate smooth movement of devotees and locals across the Godavari river during the upcoming Simhastha Kumbh Mela.
    • It is intended exclusively for pedestrian use, improving safety and reducing congestion along key city routes.
  2. Location and Connectivity:
    • The bridge will span from Balaji Kot to Ganeshwadi vegetable market on the Godavari.
    • It will connect Panchavati and Saraf Bazaar-Bhandi Bazaar-Kapda Bazaar areas with the Main Road areas, improving accessibility across major local markets and pilgrimage routes.
  3. Design and Specifications:
    • A cable-stayed design has been proposed.
    • Estimated length: ~175 meters.
    • Estimated cost: Rs 24.11 crore.
  4. Project Timeline:
    • DPR has been completed and approved by the NMC General Body.
    • Pre-bid meeting: October 30, 2025.
    • Bid submission deadline: November 6, 2025.
    • Bid opening: November 7, 2025.
    • Work order expected by November end 2025, with construction beginning in December 2025.
    • Target completion: March 2027.
  5. Administrative Process:
    • The project is being executed by Nashik Municipal Corporation (NMC) with consultants preparing the DPR.
    • Tender process has been floated to select the contractor.

Static Facts:

  • Location: Godavari River, Nashik, Maharashtra
  • Type: Cable-stayed pedestrian bridge
  • Estimated length: 175 meters
  • Estimated cost: Rs 24.11 crore
  • Purpose: Facilitate movement during Simhastha Kumbh Mela
  • Project Authority: Nashik Municipal Corporation (NMC)

    Updated - Oct 25, 2025, 01:02 PM | TOI